# TOYOTA Engagement Video Eps. 3 (Quantity)

PT Kode Solusi International, Clipping campaign on TernakKlip. active. Checked 11 Nov, 1:37 am ET.

## ClipCPM Grade: not graded

Not graded. Pays a flat fee per post, not per view.

Listed as open. Run by PT Kode Solusi International. No application flag is listed; account and campaign requirements still apply. Payout examples use eligible views and listed terms, before any unknown platform fees.
## What it pays

- Rate: $0.00 per 1K views
- By app: TikTok $0.00, Instagram $0.00
- A 10K-view clip: $0.19
- TikTok terms: $0.00 per 1K; minimum views not listed; minimum payout n/a; per-post cap n/a. Before unverified fees.
- Instagram terms: $0.00 per 1K; minimum views not listed; minimum payout n/a; per-post cap n/a. Before unverified fees.
- Apps: TikTok, Instagram
- Where: Indonesia
- Joining: no application flag listed; check account and campaign requirements

## Budget

- $147.46 of $387.55 left
- Forecast: n/a

## Track record

- Views: Hidden
- Approved posts: 1.2K
- Clippers: 318
- First seen: 10 Nov, 2:43 pm ET

Join / verify terms: https://ternakklip.com/discover

## Brief

Pays in rupiah: Rp 3.500 per video. Dollar amounts here use the European Central Bank's rate for the day it was read.

## Who this campaign is set up for

The location field states Indonesia. The language field states Indonesian.

Match these requirements to the account you will actually post from. A language label does not by itself establish an audience-country percentage, and a missing follower requirement does not prove that a new account will qualify. Use the full campaign brief to settle those details before posting.



## What the public activity tells you

The source reports 1.2K approved posts. These totals describe the observed campaign record. They do not show the typical result for a new participant, the distribution of earnings, or a verified chance of approval.

Use the activity history to understand whether there is visible participation, then check the latest campaign status and remaining terms separately. Previous approvals or reported payouts do not establish that new work is being approved or paid today.


